The project therefore began with a wider question than how much could be built. It asked how change could strengthen the High Road without losing the qualities that already made it work. Giving back to the local community was also part of our brief.
Reading the Street
Before drawing the building, we drew the street.
Long photographic elevations recorded both sides of the High Road, while the dimensions of individual shopfronts were mapped along its length. The survey revealed a consistent human rhythm beneath the apparent visual noise. Most retail bays were between four and six metres wide. A strong band of shopfronts and signage held the street together, while taller buildings tended to mark junctions and changes in direction.
These observations became design rules. The new building could be larger than its neighbours, but its lower levels would continue the scale and cadence of the existing High Road.



More Than Housing
Consultation with the local community broadened the brief. The project was not to be simply a retail redevelopment with apartments above; it created opportunities to give something useful to the neighbourhood.
The completed proposal brought together 43 homes, ranging from one-bedroom apartments to three-bedroom family duplexes, with the full affordable housing provision accommodated on the site. Every home was given private external amenity space.
A crèche introduced additional childcare places, a café created a community destination above the street, and a landscaped podium provided shared green space for residents and community users. The combination of homes, retail and social uses meant that the building could contribute to Wembley at different times of day and in different ways.

A Store That Needed to Stay
One of the most important constraints was also evidence of the site’s success.
The supermarket operator explained that, among approximately eighty stores across the country, the Wembley branch was one of its most profitable. Understandably, it was not eager to exchange a proven store for an uncertain future promise.
Rather than treating the retailer as an obstacle, the design treated its operational needs as part of the brief. The replacement store increased the retail floor area to approximately 1,100 square metres, introduced higher ceilings, improved deliveries away from the busiest part of the High Road and created fully glazed frontages to both streets.
The operator ultimately supported the proposal, although the final relocation remained dependent on a new lease agreement with the building owner.
This negotiation was a reminder that development is rarely only about form. A viable design has to bring architecture, ownership, occupation and everyday operations into agreement.
A Building in Human Proportions
The building was organised as a series of related scales.
At ground level, the expanded shopfront continued the active retail band of the High Road. Above it, a brick podium followed the established street rhythm, breaking the long elevations into recognisable bays rather than presenting one oversized façade. The taller residential elements stepped back and rose towards the junction, where the townscape could comfortably support greater height.
Along London Road, the composition gradually reduced in scale as it approached the quieter residential streets. Entrances, planting and smaller details softened this transition, allowing the building to respond differently to each of its two addresses while remaining one coherent piece of architecture.

Detail Found Nearby
The material character also began with close observation.
Circular pediments, herringbone brickwork, vertical panels, patterned infill, tiled roofs, Jacobean gables and Art Deco details appeared repeatedly along the High Road. None belonged to a single style, yet together they formed a recognisable local language.
The proposal did not copy these fragments literally. Instead, coloured and textured brick panels translated their scale, depth and repetition into a contemporary façade. Flatter patterns were used on the upper residential levels, while deeper, more tactile brickwork strengthened the lower storeys where it would be experienced at close range.
Context was treated not as a historic image to reproduce, but as a set of relationships that the new building could continue.
Planning Through Agreement
The scheme secured full planning consent from Brent Council.
Its success depended on resolving several ambitions at once: substantially increasing the number and range of homes, providing the affordable housing on site, retaining a commercially important retailer, adding community facilities, improving servicing, creating new landscape and responding carefully to a varied townscape.
No single decision achieved that result. Consent emerged from the cumulative work of consultation, analysis, negotiation and design — each part allowing the others to become possible.
Wembley began with a busy corner and a building that was already doing something valuable.
The project showed that regeneration need not begin by dismissing what exists. The profitable shop, the rhythm of the High Road, its repeated brick details and the requests made through public consultation all became part of the architecture.
A development of this scale is not defined by height or unit numbers alone. Its scale is found in the number of people, uses, materials and decisions it must reconcile.
By reading the street carefully, the proposal found a way to become larger while still belonging to the urban scale and life around it.




Story 23 / Project data
Reading the High Road
- Location
- 435–441 High Road, Wembley, London
- Project type
- Mixed-use town-centre regeneration
- Role
- Principal Architect, Lead Designer
- Collaboration
- Clive Sall Architecture
- Scope
- 1,100 m² replacement supermarket, 43 new homes, from one-bedroom apartments to three-bedroom family duplexes. Full affordable housing provision accommodated on site including community crèche, café and landscaped podium garden
- Themes
- Mixed-use regeneration · Townscape · Public consultation · Commercial negotiation · Brick architecture · Community
- Status
- Full planning consent achieved